Pontiac
Local Reviews
for Pontiac, MI
Operations Manager
Darryl - Pontiac, MI 48341
Excellent Service!
Excellent Service, Personable Individual!
Lanie - Pontiac, MI 48341
Great service
Koni - Pontiac, MI 48341
Alex was very polite and knew what needed to be done
Pastor
Cornelius - Pontiac, MI 48342
Annual Service
Rick - Pontiac, MI 48341
Everything went as planned. Exceptional service and professional techs.
Technician was courteous and respectful
Brian - Pontiac, MI 48342
Robert G.
Robert G.
Robert G.
Mark S.
George S.
Robert G.
Mark S.
George S.
Mark S.
Robert G.
George S.
George S.
Terrence J.
2/12/24 Confirmed with Vera for 2/21/24 DH 11/1/23 Confirmed with Vera for 11/10/23 anytime between 8-4 DH 10/27/23 Needs to be rescheduled no power on site DH 10/25/23 Confirmed with Kari (FAS) for 10/27/23 at 12:00pmish DH 10/10/23MV Left a VM with Vera to schedule a date Sprinkler Inspection Annual Fire Sprinkler System Inspection (2 wet systems) Deficiency: Sprinkler systems are due for gauge change. 2- sprinkler gauges Deficiency: Sprinkler systems are due for five year internal obstruction investigation. 2- 4” victaulic couplings Deficiency: Sprinkler system is due for five year internal check valve inspection, fire department connection. 2 - 4” victaulic couplings Deficiency: Sprinkler system is due for five-year Hydro test fire department connection. 1- 4” Victaulic coupling
Mike R.
George S.
James J.
David H.
Terrence J.
11/20/23 ,Confirmed with Bob Davis for 12/1/23. Please call Bob when you arrive 248-762-9133 10/17/23 Left VM regarding Inspection DH Sprinkler and Stand Pipe Inspection Annual Fire Sprinkler System Inspection (3 wet, 1 dry) Annual Standpipe Inspection (2) Deficiency: Gauges are outdated 6 wet 1 dry Deficiency: System check, bypass check, discharge check and fdc check due for 5yr internal Gasket material 4- 6” red rubber gaskets 2- 4” grooved couplings Deficiency: System pipe due for 5yr internal 6- 4” grooved couplings 3- 3" grooved couplings Inoperable Deficiency: Fdc check leaks by and fdc pipe needs to be reworked outside. Addition built around fdc making it inaccessible 21’ 4” sch10 black 2- 4” grooved couplings 1- 4" viking check Deficiency: Fdc pipe due for hydro x2 Deficiency: Missing control valve, itv and main drain signs 17- control valve 5- main drain 1- itv 3rd floor by roof access 23- sign chain Deficiency: Missing spare heads and head wrenches fire pump room 2-
Terrence J.
Sprinkler Inspection 11/20/23 Confirmed with Bob Davis for 12/1/23. Please call Bob when you arrive 248-762-9133 Annual Fire Sprinkler System Inspection (1 wet) Deficiency: Sprinkler riser room needs sprinkler head, box, heads, and a wrench. There are none in the room 1- sprinkler head box 1- universal sprinkler wrench 3- 155° chrome pendant, sprinkler heads half-inch office quick response 3- 155° brass upright, sprinkler heads half inch orifice standard response Deficiency: The sprinkler system is due for five year internal alarm valve inspection. 2- 4” victaulic couplings Deficiency: Sprinkler system is due for five year hydrotest fire department connection. 1- 4” victaulic coupling Deficiency: The sprinkler system is due for five year internal inspection, sprinkler fire department connection check valve. 2- victaulic couplings Deficiency: All the control valves in main drain will need signage. 2- control valve signs 1- main drain sign Deficiency: The fire sprinkler system